Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

362

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Gasket, packing, and sealing device manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0227 #04 Y:2024 Eliminate or reduce compressed air usage $727 -
WM0227 #03 Y:2024 Install compressor air intakes in coolest locations $787 $2,103
WM0227 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,869 $2,450
WM0227 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,765 $7,055
AM0930 #08 Y:2024 Reduce space conditioning during non-working hours $865 $390
AM0930 #07 Y:2024 Install occupancy sensors $1,095 $2,460
AM0930 #06 Y:2024 Install compressor air intakes in coolest locations $1,915 $720
AM0930 #05 Y:2024 Use synthetic lubricant $2,360 $90
AM0930 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $8,120 $700
AM0930 #03 Y:2024 Optimize plant power factor $37,800 $99,305
AM0930 #02 Y:2024 Utilize controls to operate equipment only when needed $41,855 $2,780
AM0930 #01 Y:2024 Apply for tax-free status for energy purchases $439,088 $15,000
TT0299 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $221 $90
TT0299 #07 Y:2023 Reduce space conditioning during non-working hours $387 $100
TT0299 #06 Y:2023 Eliminate or reduce compressed air usage $632 $750
TT0299 #05 Y:2023 Reduce heat gain by window tinting $809 $3,500
TT0299 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $1,491 $40
TT0299 #03 Y:2023 Recover waste heat from equipment $2,097 $30
TT0299 #02 Y:2023 Use solar heat to make electricty $9,312 $22,135
TT0299 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $20,478 $8,003