| Assessment Year | 2023 |
|---|---|
| Principal Product | Automotive Head Gaskets |
| NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
| SIC | 3053: Gaskets, Packing, and Sealing Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 43 |
| Plant Area |
74,500
ft2
|
| Annual Production | 4,600,000
units
|
| Production Hrs. Annual | 5,000
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $61,899 | 677,750 |
kWh
|
$0.091 | |
| Electricity Demand | $27,383 | 2,082 |
kW-mo/yr
|
$13.15 | |
| Electricity Fees | $1,339 | - |
|
- | |
| Natural Gas | $10,580 | 750 |
MMBtu
|
$14.11 | |
| Waste Disposal Costs | |||||
| Water Usage | $4,002 | 254 |
Tgal
|
$15.78 | |
| Water Disposal | $3,505 | 254 |
Tgal
|
$13.82 | |
| TOTAL YEARLY COSTS | $108,708 | ||||
| RECOMMENDED SAVINGS* | $35,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,478 | $8,003 |
$15,217
166,670
kWh
|
$5,261
-
kW-mo/yr
|
- | |
| 02 | 2.9114: Use solar heat to make electricty | $9,312 | $22,135 |
$9,312
101,991
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $2,097 | $30 | - | - |
$2,097
-
MMBtu
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,491 | $40 |
$1,491
16,335
kWh
|
- | - | |
| 05 | 2.7423: Reduce heat gain by window tinting | $809 | $3,500 |
$809
8,862
kWh
|
- | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $632 | $750 |
$632
6,921
kWh
|
- | - | |
| 07 | 2.7224: Reduce space conditioning during non-working hours | $387 | $100 |
$387
4,237
kWh
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $221 | $90 |
$221
2,421
kWh
|
- | - | |
| TOTAL RECOMMENDED | $35,427 | $34,648 |
$28,069
307,437
kWh
|
$5,261
-
kW-mo/yr
|
$2,097
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs