ITAC Assessment: LM0051
ITAC logo
ITAC Assessment: LM0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product organic tortilla chips and taco shells
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 50,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,050 2,021,190
kWh
Electricity Demand $36,013 4,380
kW-mo/yr
Electricity Fees $26,557 -
Natural Gas $213,486 51,202
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $321,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $158,656

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,243 $1,760 $2,053
15,828
kWh
$190
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $3,478 $1,466 $3,184
24,545
kWh
$294
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $510 $210 $896
7,506
kWh
$134
-
kW-mo/yr
$(-520.0) -
04 2.4239: Eliminate or reduce compressed air usage $192 $150 $192
1,609
kWh
- - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $7,233 $3,600 $6,622
51,048
kWh
$611
-
kW-mo/yr
- -
06 4.431: Train operators for maximum operating efficiency $145,000 $38,029 - - - $145,000
07 4.431: Train operators for maximum operating efficiency $163,200 $19,584 - - - $163,200
TOTAL RECOMMENDED $321,856 $64,799 $12,947
100,536
kWh
$1,229
-
kW-mo/yr
$(-520.0) $308,200
TOTAL IMPLEMENTED $158,656 $45,215 $12,947
100,536
kWh
$1,229
-
kW-mo/yr
$(-520.0) $145,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs