ITAC Assessment: AM0930
ITAC logo
ITAC Assessment: AM0930
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Elastomer seals for oilfield use
NAICS 339991: Gasket, Packing, and Sealing Device Manufacturing
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 115,000
ft2
Annual Production 107,000
units
Production Hrs. Annual 5,840
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $838,143 11,555,539
kWh
Electricity Demand $233,714 26,935
kW-mo/yr
Electricity Fees $103,632 -
Natural Gas $53,105 13,805
MMBtu
TOTAL YEARLY COSTS $1,228,594
RECOMMENDED SAVINGS* $533,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $439,088 $15,000 - - $87,818 $351,270
02 2.6231: Utilize controls to operate equipment only when needed $41,855 $2,780 $41,855
581,320
kWh
- - -
03 2.3212: Optimize plant power factor $37,800 $99,305 - $37,800
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,120 $700 $6,275
87,136
kWh
$1,845
-
kW-mo/yr
- -
05 2.4314: Use synthetic lubricant $2,360 $90 $1,823
25,320
kWh
$537
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,915 $720 $1,610
22,340
kWh
$305
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $1,095 $2,460 $1,095
15,185
kWh
- - -
08 2.7224: Reduce space conditioning during non-working hours $865 $390 $720
9,990
kWh
$145
-
kW-mo/yr
- -
TOTAL RECOMMENDED $533,098 $121,445 $53,378
741,291
kWh
$40,632
-
kW-mo/yr
$87,818 $351,270
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs