ITAC Assessment: MI0019
ITAC logo
ITAC Assessment: MI0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ambulances and Light rescue trucks
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $1
M
to 5
M
# of Employees 325
Plant Area 223,925
ft2
Annual Production 2,520
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $163,636 2,773,494
kWh
Electricity Demand $41,510 9,875
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $20,022 $10,000 n/a $20,022
138,709
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,044 $312 n/a $4,044
68,544
kWh
-
03 3.2123: Convert to high volume low pressure (hvlp) paint guns $8,400 $2,000 n/a - $8,400
04 2.7233: Use properly designed and sized hvac equipment $2,290 $2,530 n/a $2,290
38,814
kWh
-
05 2.7232: Replace existing hvac unit with high efficiency model $8,266 $14,000 n/a $8,266
140,102
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $9,991 $288 n/a $9,991
169,340
kWh
-
TOTAL RECOMMENDED $53,013 $29,130 $44,613
555,509
kWh
$8,400
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs