| Assessment Year | 2001 |
|---|---|
| Principal Product | Ambulances and Light rescue trucks |
| NAICS |
n/a
|
| SIC | 3711: Motor Vehicles and Passenger Car Bodies |
| Sales Range | $1 M to 5M |
| # of Employees | 325 |
| Plant Area |
223,925
ft2
|
| Annual Production | 2,520
pieces
|
| Production Hrs. Annual | 2,168
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $163,636 | 2,773,494 |
kWh
|
$0.059 |
| Electricity Demand | $41,510 | 9,875 |
kW-mo/yr
|
$4.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $53,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Product Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $20,022 | $10,000 | n/a |
$20,022
138,709
kWh
|
- |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,044 | $312 | n/a |
$4,044
68,544
kWh
|
- |
| 03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $8,400 | $2,000 | n/a | - | $8,400 |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $2,290 | $2,530 | n/a |
$2,290
38,814
kWh
|
- |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $8,266 | $14,000 | n/a |
$8,266
140,102
kWh
|
- |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $9,991 | $288 | n/a |
$9,991
169,340
kWh
|
- |
| TOTAL RECOMMENDED | $53,013 | $29,130 |
$44,613
555,509
kWh
|
$8,400 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs