Assessment Year | 2001 |
---|---|
Principal Product | Ambulances and Light rescue trucks |
NAICS |
n/a
|
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $1 M to 5M |
# of Employees | 325 |
Plant Area |
223,925
ft2
|
Annual Production | 2,520
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,636 | 2,773,494 |
kWh
|
$0.059 |
Electricity Demand | $41,510 | 9,875 |
kW-mo/yr
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Product Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $20,022 | $10,000 | n/a |
$20,022
138,709
kWh
|
- |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,044 | $312 | n/a |
$4,044
68,544
kWh
|
- |
03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $8,400 | $2,000 | n/a | - | $8,400 |
04 | 2.7233: Use properly designed and sized hvac equipment | $2,290 | $2,530 | n/a |
$2,290
38,814
kWh
|
- |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $8,266 | $14,000 | n/a |
$8,266
140,102
kWh
|
- |
06 | 2.7111: Reduce illumination to minimum necessary levels | $9,991 | $288 | n/a |
$9,991
169,340
kWh
|
- |
TOTAL RECOMMENDED | $53,013 | $29,130 |
$44,613
555,509
kWh
|
$8,400 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs