1,311
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0664 #03 Y:2024 | 03 | 2024 | Use waste heat from hot flue gases to preheat | $3,786 | $6,845 | |
| SD0664 #02 Y:2024 | 02 | 2024 | Use battery storage for demand control | $82,562 | $4,772 | |
| SD0664 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $564,124 | $638,912 | |
| NT0038 #05 Y:2024 | 05 | 2024 | Apply for investment incentives | $52,835 | $5,000 | |
| NT0038 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $3,311 | - | |
| NT0038 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,524 | $5,609 | |
| NT0038 #02 Y:2024 | 02 | 2024 | Lower temperature during the winter season and vice-versa | $7,913 | - | |
| NT0038 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $390 | $370 | |
| UU0260 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $489 | $1,818 | |
| UU0260 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $726 | $3,000 | |
| UU0260 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $2,557 | $6,277 | |
| UU0260 #03 Y:2024 | 03 | 2024 | Eliminate or reduce compressed air usage | $4,696 | $8,277 | |
| UU0260 #02 Y:2024 | 02 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $10,585 | $5,800 | |
| UU0260 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $27,825 | $247,680 | |
| UF0621 #12 Y:2024 | 12 | 2024 | Install automatic part storage / retreval system | $8,191 | $40,000 | |
| UF0621 #11 Y:2024 | 11 | 2024 | Improve space comfort conditioning | $11,856 | $4,760 | |
| UF0621 #10 Y:2024 | 10 | 2024 | Level zero – install control systems for existing equipment | $13,815 | $60,000 | |
| UF0621 #09 Y:2024 | 09 | 2024 | Replace existing equipment with more suitable substitutes | $15,000 | $3,868 | |
| UF0621 #08 Y:2024 | 08 | 2024 | Develop standard operating procedures | $15,000 | $700 | |
| UF0621 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $1,807 | $3,048 |