Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,311

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Medical equipment and supplies manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0664 #03 Y:2024 Use waste heat from hot flue gases to preheat $3,786 $6,845
SD0664 #02 Y:2024 Use battery storage for demand control $82,562 $4,772
SD0664 #01 Y:2024 Use solar heat to make electricty $564,124 $638,912
NT0038 #05 Y:2024 Apply for investment incentives $52,835 $5,000
NT0038 #04 Y:2024 Reduce the pressure of compressed air to the minimum required $3,311 -
NT0038 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $12,524 $5,609
NT0038 #02 Y:2024 Lower temperature during the winter season and vice-versa $7,913 -
NT0038 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $390 $370
UU0260 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $489 $1,818
UU0260 #05 Y:2024 Turn off equipment during breaks, reduce operating time $726 $3,000
UU0260 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,557 $6,277
UU0260 #03 Y:2024 Eliminate or reduce compressed air usage $4,696 $8,277
UU0260 #02 Y:2024 Reschedule plant operations or reduce load to avoid peaks $10,585 $5,800
UU0260 #01 Y:2024 Use solar heat to make electricty $27,825 $247,680
UF0621 #12 Y:2024 Install automatic part storage / retreval system $8,191 $40,000
UF0621 #11 Y:2024 Improve space comfort conditioning $11,856 $4,760
UF0621 #10 Y:2024 Level zero – install control systems for existing equipment $13,815 $60,000
UF0621 #09 Y:2024 Replace existing equipment with more suitable substitutes $15,000 $3,868
UF0621 #08 Y:2024 Develop standard operating procedures $15,000 $700
UF0621 #07 Y:2024 Install occupancy sensors $1,807 $3,048