ITAC Assessment: UF0621
ITAC logo
ITAC Assessment: UF0621
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Medical / Dental Operatory Equipment
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 63,000
ft2
Annual Production 52,811
units
Production Hrs. Annual 4,290
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,269 891,274
kWh
Electricity Fees $25,550 -
LPG $18,837 282
MMBtu
TOTAL YEARLY COSTS $182,656
RECOMMENDED SAVINGS* $229,865 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $106,203 $322,608 $106,203
685,184
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $26,440 $12,390 $(-1,224.0)
(-7,899)
kWh
$27,664
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,063 $456 $10,063
64,921
kWh
-
04 2.3191: Use demand controller or load shedder $9,670 $4,795 $9,670
62,389
kWh
-
05 2.4133: Use most efficient type of electric motors $6,374 $17,850 $6,374
41,123
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $5,446 $25,340 $5,446
35,137
kWh
-
07 2.7135: Install occupancy sensors $1,807 $3,048 $1,807
11,657
kWh
-
08 4.625: Develop standard operating procedures $15,000 $700 - $15,000
09 4.652: Replace existing equipment with more suitable substitutes $15,000 $3,868 - $15,000
10 4.661: Level zero – install control systems for existing equipment $13,815 $60,000 $13,815
89,127
kWh
-
11 4.424: Improve space comfort conditioning $11,856 $4,760 - $11,856
12 4.448: Install automatic part storage / retreval system $8,191 $40,000 - $8,191
TOTAL RECOMMENDED $229,865 $495,815 $152,154
981,639
kWh
$77,711
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs