ITAC Assessment: UD0477
ITAC logo
ITAC Assessment: UD0477
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product corrugated shipping containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 140,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 6,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,577 3,669,695
kWh
Natural Gas $150,000 47,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $1,927 - - $1,927
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $6,045 $4,000 - $6,045
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,867 $5,759 $2,867
34,291
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,444 $4,300 $3,129
63,892
kWh
- - $315
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,196 $21,000 $3,969
81,184
kWh
$(-613.0)
-
MMBtu
- $2,840
06 3.4116: Meter recycled water (to reduce sewer charges) $3,150 $250 - - - $3,150
07 3.4156: Use flow control valves on equipment to optimize water use $1,625 $600 - - $1,625
-
Tgal
-
08 3.4115: Recover and reuse cooling water $10,234 $2,500 - $484
-
MMBtu
$9,750
-
Tgal
-
09 3.4115: Recover and reuse cooling water $16,375 $7,500 - $775
-
MMBtu
$15,600
-
Tgal
-
TOTAL RECOMMENDED $51,863 $45,909 $9,965
179,367
kWh
$8,618
-
MMBtu
$26,975
-
Tgal
$6,305
TOTAL IMPLEMENTED $40,004 $42,809 $9,965
179,367
kWh
$8,134
-
MMBtu
$15,600
-
Tgal
$6,305
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs