Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0991 #06 Y:2024 Use solar heat to make electricty $30,391 $338,893
GT0991 #05 Y:2024 Turn off equipment when not in use $241 $1,233
GT0991 #04 Y:2024 Eliminate or reduce compressed air usage $1,011 $2,100
GT0991 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $642 $400
GT0991 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,393 $1,850
GT0991 #01 Y:2024 Conserve energy by efficient use of vending machines $453 $180
OK1086 #04 Y:2022 Use solar heat to make electricty $31,948 $382,200
OK1086 #03 Y:2022 Use radiant heater for spot heating $8,472 $13,560
OK1086 #02 Y:2022 Install compressor air intakes in coolest locations $630 $330
OK1086 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,012 $1,489
UU0213 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $639 $1,950
UU0213 #04 Y:2022 Optimize plant power factor $1,190 $3,000
UU0213 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,602 $1,773
UU0213 #02 Y:2022 Install occupancy sensors $5,181 $18,250
UU0213 #01 Y:2022 Use power during off-peak periods $7,487 $8,000
UU0212 #07 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $382 $1,370
UU0212 #06 Y:2022 Use hot process fluids to preheat incoming process fluids $425 $850
UU0212 #05 Y:2022 Use optimum thickness insulation $4,220 $4,402
UU0212 #04 Y:2022 Optimize plant power factor $4,400 $9,000
UU0212 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $8,326 $21,555