ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
GT0991 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $30,391 | $338,893 |
n/a
|
GT0991 #05 Y:2024 | 05 | 2024 | Turn off equipment when not in use | $241 | $1,233 |
n/a
|
GT0991 #04 Y:2024 | 04 | 2024 | Eliminate or reduce compressed air usage | $1,011 | $2,100 |
n/a
|
GT0991 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $642 | $400 |
n/a
|
GT0991 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,393 | $1,850 |
n/a
|
GT0991 #01 Y:2024 | 01 | 2024 | Conserve energy by efficient use of vending machines | $453 | $180 |
n/a
|
OK1086 #04 Y:2022 | 04 | 2022 | Use solar heat to make electricty | $31,948 | $382,200 | |
OK1086 #03 Y:2022 | 03 | 2022 | Use radiant heater for spot heating | $8,472 | $13,560 | |
OK1086 #02 Y:2022 | 02 | 2022 | Install compressor air intakes in coolest locations | $630 | $330 | |
OK1086 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,012 | $1,489 | |
UU0213 #05 Y:2022 | 05 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $639 | $1,950 | |
UU0213 #04 Y:2022 | 04 | 2022 | Optimize plant power factor | $1,190 | $3,000 | |
UU0213 #03 Y:2022 | 03 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,602 | $1,773 | |
UU0213 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $5,181 | $18,250 | |
UU0213 #01 Y:2022 | 01 | 2022 | Use power during off-peak periods | $7,487 | $8,000 | |
UU0212 #07 Y:2022 | 07 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $382 | $1,370 | |
UU0212 #06 Y:2022 | 06 | 2022 | Use hot process fluids to preheat incoming process fluids | $425 | $850 | |
UU0212 #05 Y:2022 | 05 | 2022 | Use optimum thickness insulation | $4,220 | $4,402 | |
UU0212 #04 Y:2022 | 04 | 2022 | Optimize plant power factor | $4,400 | $9,000 | |
UU0212 #03 Y:2022 | 03 | 2022 | Utilize higher efficiency lamps and/or ballasts | $8,326 | $21,555 |