ITAC Assessment: GT0991
ITAC logo
ITAC Assessment: GT0991
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Partitions, Lockers, and Accessories
NAICS 337127: Institutional Furniture Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 177,948
ft2
Annual Production 131,493
units
Production Hrs. Annual 2,340
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,857 1,824,309
kWh
Natural Gas $58,867 5,439
MMBtu
TOTAL YEARLY COSTS $144,724
RECOMMENDED SAVINGS* $36,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.6211: Conserve energy by efficient use of vending machines $453 $180 $453
9,647
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,393 $1,850 $6,293
133,888
kWh
$(-2,900.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $642 $400 $642
13,652
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,011 $2,100 $1,011
21,502
kWh
-
05 2.6218: Turn off equipment when not in use $241 $1,233 $241
5,125
kWh
-
06 2.9114: Use solar heat to make electricty $30,391 $338,893 $30,391
645,760
kWh
-
TOTAL RECOMMENDED $36,131 $344,656 $39,031
829,574
kWh
$(-2,900.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs