ITAC Assessment: SD0670
ITAC logo
ITAC Assessment: SD0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Furniture
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 32,000
ft2
Annual Production 60
pieces
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,097 320,430
kWh
Electricity Demand $65,480 2,178
kW-mo/yr
Electricity Fees $2,576 -
TOTAL YEARLY COSTS $107,153
RECOMMENDED SAVINGS* $42,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $30,558 $134,423 $14,954
122,570
kWh
$15,605
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $5,044 $470 $(-439.2)
(-3,600)
kWh
$5,483
-
kW-mo/yr
03 2.4223: Install direct acting units in place of compressed air pressure system in safety system $1,711 $6,733 $1,711
14,022
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $161 $932 $122
998
kWh
$40
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $60 - $60
489
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,220 $3,314 $875
7,161
kWh
$1,345
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,896 $9,455 $1,593
13,050
kWh
$303
-
kW-mo/yr
08 2.1121: Use insulation in furnaces to facilitate heating / cooling $669 $511 $669
5,480
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $459 $1,842 $459
3,762
kWh
-
TOTAL RECOMMENDED $42,778 $157,680 $20,002
163,932
kWh
$22,776
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs