Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

319

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Upholstered household furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0459 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $13,399 $125,000
MS0459 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,256 $15,684
MS0459 #02 Y:2025 Air condition only space necessary $7,093 $16,009
MS0459 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,270 $5,219
MS0456 #04 Y:2025 Level zero – install control systems for existing equipment $2,657 $900
MS0456 #03 Y:2025 Install vinyl strip / high speed / air curtain doors $1,170 $14,739
MS0456 #02 Y:2025 Do not use compressed air for personal cooling $603 -
MS0456 #01 Y:2025 Replace fossil fuel equipment with electrical equipment $31,025 $150,000
LE0568 #09 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,779 $78,580
LE0568 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,570 $9,661
LE0568 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $684 $950
LE0568 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $17,295 $12,500
LE0568 #05 Y:2024 Insulate bare equipment $1,730 $1,215
LE0568 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,155 $1,400
LE0568 #03 Y:2024 Install timers and/or thermostats $6,769 $1,120
LE0568 #02 Y:2024 Turn off equipment during breaks, reduce operating time $3,890 $200
LE0568 #01 Y:2024 Change rate schedules or other changes in utility service $8,304 -
LE0547 #05 Y:2023 Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,147 $30,000
LE0547 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,448 $13,930
LE0547 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $602 $1,720