ITAC Assessment: LE0547
ITAC logo
ITAC Assessment: LE0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Lift Chairs
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 135,000
ft2
Annual Production 65,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,650 883,685
kWh
Electricity Demand $12,194 3,060
kW-mo/yr
Electricity Fees $3,353 -
Natural Gas $21,110 607
MMBtu
TOTAL YEARLY COSTS $133,307
RECOMMENDED SAVINGS* $13,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,896

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4323: Use optimum size and capacity equipment $846 $400 $846
7,758
kWh
- - -
02 2.2443: Re-use or recycle hot or cold process exhaust air $2,446 $1,500 - - $2,446
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $602 $1,720 $516
4,732
kWh
$86
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,448 $13,930 $2,950
27,070
kWh
$498
-
kW-mo/yr
- -
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $6,147 $30,000 $813
7,460
kWh
$134
-
kW-mo/yr
- $5,200
TOTAL RECOMMENDED $13,489 $47,550 $5,125
47,020
kWh
$718
-
kW-mo/yr
$2,446
-
MMBtu
$5,200
TOTAL IMPLEMENTED $4,896 $16,050 $4,312
39,560
kWh
$584
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs