Assessment Year | 1990 |
---|---|
Principal Product | TREATED LUMBER |
NAICS |
n/a
|
SIC | 2491: Wood Preserving |
Sales Range | $10 M to 50M |
# of Employees | 95 |
Plant Area |
n/a
|
Annual Production | 1,800
thousand feet
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,743 | 1,986,811 |
kWh
|
$0.069 |
Natural Gas | $3,575 | 968 |
MMBtu
|
$3.69 |
Wood | $42,720 | 489,856 |
MMBtu
|
$0.087 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,173 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $12,075 | $50,000 |
$12,075
215,416
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,720 | $1,100 |
$4,720
94,666
kWh
|
- | - | |
03 | 2.2121: Increase amount of condensate returned | $4,500 | - | - | - |
$4,500
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $4,080 | $16,400 | - | - |
$4,080
-
MMBtu
|
|
05 | 2.2162: Reduce excess steam bleeding | $3,575 | $3,750 | - |
$3,575
-
MMBtu
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,030 | - |
$2,030
55,393
kWh
|
- | - | |
07 | 2.3212: Optimize plant power factor | $1,800 | $3,500 |
$1,800
-
kWh
|
- | - | |
08 | 2.2135: Repair and eliminate steam leaks | $1,600 | $2,400 | - | - |
$1,600
-
MMBtu
|
|
09 | 2.4312: Improve lubrication practices | $1,600 | - |
$1,600
32,239
kWh
|
- | - | |
10 | 2.2136: Install / repair insulation on steam lines | $602 | $2,665 | - | - |
$602
-
MMBtu
|
|
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $155 | $319 |
$155
2,052
kWh
|
- | - | |
12 | 2.2511: Insulate bare equipment | $216 | $875 | - | - |
$216
-
MMBtu
|
|
TOTAL RECOMMENDED | $36,953 | $81,009 |
$22,380
399,766
kWh
|
$3,575
-
MMBtu
|
$10,998
-
MMBtu
|
||
TOTAL IMPLEMENTED | $13,173 | $27,259 |
$6,675
96,718
kWh
|
- |
$6,498
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs