Assessment Year 2021
Principal Product wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 3
Plant Area 200,000
ft2
Annual Production 365,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,974 939,520
kWh
Electricity Demand $50,308 2,301
kW-mo/yr
Electricity Fees $1,167 -
TOTAL YEARLY COSTS $80,449
RECOMMENDED SAVINGS* $91,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,514 $444 $771
24,878
kWh
$743
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,021 $2,633 $556
17,945
kWh
$1,465
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $231 $650 $231
7,437
kWh
- - - - -
04 2.6242: Minimize operation of equipment maintained in standby condition $85 $285 $85
2,754
kWh
- - - - -
05 2.6212: Turn off equipment during breaks, reduce operating time $26,160 $9,000 $13,306
429,240
kWh
$12,854
-
kW-mo/yr
- - - -
06 2.5194: Redesign process $16,187 $25,000 $3,259
105,120
kWh
$3,148
-
kW-mo/yr
- - $9,780 -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,415 $13,780 $(-48.0)
(-1,560)
kWh
$(-197.0)
-
kW-mo/yr
- $1,560
-
gal
$9,100 -
08 2.7111: Reduce illumination to minimum necessary levels $21,003 - $1,629
52,560
kWh
$1,574
-
kW-mo/yr
- - - $17,800
09 3.4159: Replace treated water with well / surface water $13,774 $4,000 $(-361.0)
(-11,638)
kWh
$(-1,465.0)
-
kW-mo/yr
$15,600
-
Tgal
- - -
10 2.7224: Reduce space conditioning during non-working hours $356 $78 $356
11,468
kWh
- - - - -
TOTAL RECOMMENDED $91,746 $55,870 $19,784
638,204
kWh
$18,122
-
kW-mo/yr
$15,600
-
Tgal
$1,560
-
gal
$18,880 $17,800
TOTAL IMPLEMENTED - - - - - - - -