Assessment Year | 2024 |
---|---|
Principal Product | Light weight furniture |
NAICS | 337121: Upholstered Household Furniture Manufacturing |
SIC | 2514: Metal Household Furniture |
Sales Range | $10 M to 50M |
# of Employees | 38 |
Plant Area |
135,000
ft2
|
Annual Production | 20,000
units
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $75,081 | 1,005,533 |
kWh
|
$0.075 | |
Electricity Demand | $19,467 | 3,813 |
kW-mo/yr
|
$5.11 | |
Electricity Fees | $9,007 | - |
|
- | |
Natural Gas | $83,373 | 7,618 |
MMBtu
|
$10.94 | |
Waste Disposal Costs | |||||
Water Usage | $20,379 | 3 |
Tgal
|
$6,066.98 | |
TOTAL YEARLY COSTS | $207,307 | ||||
RECOMMENDED SAVINGS* | $53,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $42,713 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $8,304 | - | - | - | - | $8,304 | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,890 | $200 |
$3,890
51,870
kWh
|
- | - | - | |
03 | 2.7261: Install timers and/or thermostats | $6,769 | $1,120 |
$4,220
56,260
kWh
|
- |
$2,549
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,155 | $1,400 |
$1,658
22,110
kWh
|
$497
-
kW-mo/yr
|
- | - | |
05 | 2.2511: Insulate bare equipment | $1,730 | $1,215 | - | - |
$1,730
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,295 | $12,500 |
$13,309
177,450
kWh
|
$3,986
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $684 | $950 |
$526
7,016
kWh
|
$158
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,570 | $9,661 |
$2,054
27,393
kWh
|
$516
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,779 | $78,580 |
$7,020
93,600
kWh
|
$2,759
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $53,176 | $105,626 |
$32,677
435,699
kWh
|
$7,916
-
kW-mo/yr
|
$4,279
-
MMBtu
|
$8,304 | ||
TOTAL IMPLEMENTED | $42,713 | $26,096 |
$25,131
335,083
kWh
|
$4,999
-
kW-mo/yr
|
$4,279
-
MMBtu
|
$8,304 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs