ITAC Assessment: AM0074
ITAC logo
ITAC Assessment: AM0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product RUBBER SHEETING
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,225
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $295,400 5,823,564
kWh
Natural Gas $70,921 24,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $14,280 $1,400 $14,280
306,565
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,850 $2,800 $7,850
168,523
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,840 - $6,840
-
kWh
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,600 $2,500 $4,600
156,800
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,360 $660 $2,360
50,410
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,580 $1,000 $1,580
49,238
kWh
07 2.2511: Insulate bare equipment $665 $270 $665
20,809
kWh
TOTAL RECOMMENDED $38,175 $8,630 $38,175
752,345
kWh
TOTAL IMPLEMENTED $38,175 $8,630 $38,175
752,345
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs