Assessment Year | 2014 |
---|---|
Principal Product | Processed meats |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | less than $500 k |
# of Employees | 375 |
Plant Area |
150,000
ft2
|
Annual Production | 76,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,191,750 | 18,442,746 |
kWh
|
$0.065 |
Electricity Demand | $619,404 | 49,238 |
kW-mo/yr
|
$12.58 |
Natural Gas | $855,373 | 191,204 |
MMBtu
|
$4.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $380,546 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $39,912 | $68,000 | - | - |
$39,912
-
MMBtu
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $39,318 | $17,000 | - | - |
$39,318
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,435 | $1,410 |
$1,232
19,064
kWh
|
$1,384
-
kW-mo/yr
|
- | - | $819 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,183 | $77,150 |
$31,096
481,212
kWh
|
$11,087
-
kW-mo/yr
|
- | - | - | |
05 | 4.445: Install equipment to move product | $66,000 | $172,000 | - | - | - | $66,000 | - | |
06 | 2.3212: Optimize plant power factor | $36,422 | $79,091 | - |
$36,422
-
kW-mo/yr
|
- | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,479 | $1,560 |
$1,903
29,446
kWh
|
$576
-
kW-mo/yr
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $3,568 | $900 | - | - |
$3,568
-
MMBtu
|
- | - | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,108 | - |
$869
13,449
kWh
|
$239
-
kW-mo/yr
|
- | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $122,690 | $136,460 |
$122,690
1,898,638
kWh
|
- | - | - | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,380 | $2,700 |
$4,380
67,782
kWh
|
- | - | - | - | |
12 | 2.4314: Use synthetic lubricant | $19,051 | $3,070 |
$19,051
294,820
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $380,546 | $559,341 |
$181,221
2,804,411
kWh
|
$49,708
-
kW-mo/yr
|
$82,798
-
MMBtu
|
$66,000 | $819 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||