ITAC Assessment: MS0456
ITAC logo
ITAC Assessment: MS0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Motion Furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 360,000
ft2
Annual Production 96,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,641 2,000,456
kWh
Electricity Demand $95,838 6,833
kW-mo/yr
LPG $37,240 1,142
MMBtu
TOTAL YEARLY COSTS $298,719
RECOMMENDED SAVINGS* $35,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $31,025 $150,000 $(-6,215.0)
(-74,880)
kWh
$37,240
-
MMBtu
02 2.4238: Do not use compressed air for personal cooling $603 - $603
7,271
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,170 $14,739 $1,170
14,091
kWh
-
04 4.661: Level zero – install control systems for existing equipment $2,657 $901 $2,657
32,007
kWh
-
TOTAL RECOMMENDED $35,455 $165,640 $(-1,785.0)
(-21,511)
kWh
$37,240
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs