ITAC Assessment: MA0093
ITAC logo
ITAC Assessment: MA0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area
n/a
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $394,455 5,330,012
kWh
Natural Gas $5,265 689
MMBtu
Fuel Oil #2 $25,188 5,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,617 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,938 $785 $4,938
66,530
kWh
- -
02 2.6232: Install set-back timers $3,744 $450 $3,744
50,703
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $916 $250 $916
12,309
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,650 - $3,650
49,238
kWh
- -
05 2.4321: Upgrade obsolete equipment $1,429 $4,000 $1,429
19,343
kWh
- -
06 2.2113: Repair or replace steam traps $940 $900 - $1,840
-
MMBtu
$(-900.0)
TOTAL RECOMMENDED $15,617 $6,385 $14,677
198,123
kWh
$1,840
-
MMBtu
$(-900.0)
TOTAL IMPLEMENTED $10,444 $1,935 $9,504
128,077
kWh
$1,840
-
MMBtu
$(-900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs