| Assessment Year | 2014 |
|---|---|
| Principal Product | Fiberglass Tubing |
| NAICS | 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 54 |
| Plant Area |
80,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,950
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,422 | 1,921,419 |
kWh
|
$0.069 |
| Electricity Demand | $75,330 | 5,960 |
kW-mo/yr
|
$12.64 |
| Electricity Fees | $13,670 | - |
|
- |
| Natural Gas | $28,269 | 4,339 |
MMBtu
|
$6.52 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,987 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,503 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,035 | $343 |
$700
10,152
kWh
|
$335
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $484 | - |
$328
4,749
kWh
|
$156
-
kW-mo/yr
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,884 | $2,300 |
$2,884
41,847
kWh
|
- | - | - | |
| 04 | 2.7135: Install occupancy sensors | $116 | $240 |
$116
1,688
kWh
|
- | - | - | |
| 05 | 2.4314: Use synthetic lubricant | $12,733 | $9,000 |
$7,444
108,005
kWh
|
$5,289
-
kW-mo/yr
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $12,389 | $850 |
$12,389
179,761
kWh
|
- | - | - | |
| 07 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,503 | - |
$8,503
123,379
kWh
|
- | - | - | |
| 08 | 2.7496: Install partitions to reduce size of conditioned space | $1,492 | $5,970 | - | - |
$1,492
-
MMBtu
|
- | |
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,043 | $610 | - | - |
$1,043
-
MMBtu
|
- | |
| 10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,931 | $5,000 | - | - | - |
$4,931
-
lb
|
|
| 11 | 3.5316: Contract a wood pallet recycling company | $1,377 | - | - | - | - |
$1,377
-
lb
|
|
| TOTAL RECOMMENDED | $46,987 | $24,313 |
$32,364
469,581
kWh
|
$5,780
-
kW-mo/yr
|
$2,535
-
MMBtu
|
$6,308
-
lb
|
||
| TOTAL IMPLEMENTED | $8,503 | - |
$8,503
123,379
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs