ITAC Assessment: OK0061
ITAC logo
ITAC Assessment: OK0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CONTROLS FOR INDUSTRIES
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 4,225
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,216 3,596,131
kWh
Natural Gas $13,237 4,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,333 $19,254 $8,333
190,211
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $46 $9 $46
1,172
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $647 $997 $647
12,603
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,156 $155 $8,156
220,399
kWh
05 2.7226: Use computer programs to optimize hvac performance $57,720 $28,000 $57,720
1,564,478
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,805 $1,112 $1,805
47,479
kWh
07 2.7314: Reduce ventilation air $487 $235 $487
13,189
kWh
08 2.7422: Plant trees or shrubs near windows to shield from sunlight $2,580 $4,765 $2,580
69,754
kWh
TOTAL RECOMMENDED $79,774 $54,527 $79,774
2,119,285
kWh
TOTAL IMPLEMENTED $8,156 $155 $8,156
220,399
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs