ITAC Assessment: ND0005
ITAC logo
ITAC Assessment: ND0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MILLED WOOD PRODUCTS
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area
n/a
Annual Production 6,000
thousand feet
Production Hrs. Annual 2,340
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,319 2,182,591
kWh
Natural Gas $17,491 3,267
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $5,750 - $5,750
-
kWh
-
02 2.8114: Change rate schedules or other changes in utility service $80 $200 $80
-
kWh
-
03 2.4133: Use most efficient type of electric motors $720 $3,127 $720
12,016
kWh
-
04 2.4133: Use most efficient type of electric motors $1,663 $6,401 $1,663
23,154
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $180 $124 $180
2,638
kWh
-
06 2.2437: Recover waste heat from equipment $535 $500 - $535
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $360 $100 $360
5,862
kWh
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $78 - $121
1,758
kWh
$(-43.0)
-
MMBtu
TOTAL RECOMMENDED $9,366 $10,452 $8,874
45,428
kWh
$492
-
MMBtu
TOTAL IMPLEMENTED $9,366 $10,452 $8,874
45,428
kWh
$492
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs