ITAC Assessment: HO0216
ITAC logo
ITAC Assessment: HO0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Precious Metal Recovery
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 210,000
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $907,054 13,300,997
kWh
Electricity Demand $229,022 23,294
kW-mo/yr
Electricity Fees $(-107,960.0) -
Natural Gas $932,196 212,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,337 $24,765 $7,554
110,785
kWh
$2,783
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,354 $3,000 $1,126
16,413
kWh
$228
-
kW-mo/yr
- -
03 2.7124: Make a practice of turning off lights when not needed $4,650 $548 $4,650
68,288
kWh
- - -
04 2.7135: Install occupancy sensors $11,898 $5,000 $11,898
174,385
kWh
- - -
05 2.4133: Use most efficient type of electric motors $9,645 $10,005 $9,645
141,266
kWh
- - -
06 2.6218: Turn off equipment when not in use $4,569 - $4,569
67,116
kWh
- - -
07 2.2511: Insulate bare equipment $49,535 $11,088 $49,535
726,260
kWh
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $10,726 $4,167 - - $10,726
-
MMBtu
-
09 4.611: Begin a practice of predictive / preventative maintenance $1,665 $222 - - - $1,665
TOTAL RECOMMENDED $104,379 $58,795 $88,977
1,304,513
kWh
$3,011
-
kW-mo/yr
$10,726
-
MMBtu
$1,665
TOTAL IMPLEMENTED $27,858 $15,775 $26,193
383,939
kWh
- - $1,665
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs