Assessment Year | 1995 |
---|---|
Principal Product | Corrugated Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 103 |
Plant Area |
325,000
ft2
|
Annual Production | 420,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $185,849 | 4,376,612 |
kWh
|
$0.042 |
Natural Gas | $117,792 | 33,683 |
MMBtu
|
$3.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,614 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,436 | $2,000 | n/a | - |
$14,436
-
MMBtu
|
02 | 2.4133: Use most efficient type of electric motors | $375 | $854 | n/a |
$375
8,792
kWh
|
- |
03 | 2.4221: Install compressor air intakes in coolest locations | $444 | $170 | n/a |
$444
10,551
kWh
|
- |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $993 | $40 | n/a |
$993
23,447
kWh
|
- |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $366 | $20 | n/a |
$366
8,499
kWh
|
- |
TOTAL RECOMMENDED | $16,614 | $3,084 |
$2,178
51,289
kWh
|
$14,436
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs