ITAC Assessment: LM0066
ITAC logo
ITAC Assessment: LM0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Rigid, Rigid Flex, and Flex PCBs
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 152
Plant Area 35,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,072
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,590 2,141,487
kWh
Electricity Demand $60,386 7,368
kW-mo/yr
Electricity Fees $23,260 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,280

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7135: Install occupancy sensors $670 $68 $585
4,023
kWh
$85
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,653 $1,794 $1,576
11,840
kWh
$77
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $462 $20 $420
3,158
kWh
$42
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,818 - $2,562
19,250
kWh
$256
-
kW-mo/yr
-
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,443 $102 $1,312
9,859
kWh
$131
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $92 $87 $84
626
kWh
$8
-
kW-mo/yr
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,730 $11,000 - - $8,730
-
Tgal
TOTAL RECOMMENDED $15,868 $13,071 $6,539
48,756
kWh
$599
-
kW-mo/yr
$8,730
-
Tgal
TOTAL IMPLEMENTED $3,280 $20 $2,982
22,408
kWh
$298
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs