Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

250

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0278 #06 Y:2015 Install occupancy sensors $4,706 $2,901
MI0278 #05 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $11,235 $1,660
MI0278 #04 Y:2015 Use adjustable frequency drive or multiple speed motors on existing system $12,431 $9,248
MI0278 #03 Y:2015 Clean or color roof to reduce solar load $45,923 $79,106
MI0278 #02 Y:2015 Install vinyl strip / high speed / air curtain doors $94,012 $102,610
MI0278 #01 Y:2015 Utilize a less expensive cooling method $103,740 $220,000
MI0196 #06 Y:2010 Use optimum size and capacity equipment $3,786 $4,531
MI0196 #05 Y:2010 Reduce the pressure of compressed air to the minimum required $12,467 $40
MI0196 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $34,243 $1,210
MI0196 #03 Y:2010 Lower temperature during the winter season and vice-versa $108,082 $2,000
MI0196 #02 Y:2010 Clean or color roof to reduce solar load $113,486 $143,892
MI0196 #01 Y:2010 Utilize a less expensive cooling method $157,910 $102,500
UF0435 #05 Y:2010 Install compressor air intakes in coolest locations $7,752 $772
UF0435 #04 Y:2010 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $634 $20
UF0435 #03 Y:2010 Use most efficient type of electric motors $2,927 $9,651
UF0435 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $38,247 $18,650
UF0435 #01 Y:2010 Install occupancy sensors $60,031 $5,388
MI0194 #06 Y:2010 Lower temperature during the winter season and vice-versa $4,190 $2,000
MI0194 #05 Y:2010 Install vinyl strip / high speed / air curtain doors $4,899 $3,903
MI0194 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $8,923 $1,210