Assessment Year 2010
Principal Product Aircraft Parts & Equipment
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 204,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 3,060
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $553,219 5,532,190
kWh
Electricity Demand $116,502 11,650
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $188,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $75,044 $1,800 $53,904
539,040
kWh
$21,140
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $63,336 $80,304 $45,496
454,962
kWh
$17,840
-
kW-mo/yr
03 2.7425: Clean or color roof to reduce solar load $32,237 $65,613 $23,157
231,568
kWh
$9,080
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,923 $1,210 $6,413
64,128
kWh
$2,510
-
kW-mo/yr
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,899 $3,903 $3,519
35,188
kWh
$1,380
-
kW-mo/yr
06 2.7221: Lower temperature during the winter season and vice-versa $4,190 $2,000 $3,010
30,104
kWh
$1,180
-
kW-mo/yr
TOTAL RECOMMENDED $188,629 $154,830 $135,499
1,354,990
kWh
$53,130
-
kW-mo/yr
TOTAL IMPLEMENTED $76,449 $83,514 $54,919
549,194
kWh
$21,530
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs