Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum estrusion
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 27
Plant Area 42,868
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 4,462
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,470 2,481,818
kWh
Electricity Demand $49,939 18,264
kW-mo/yr
Natural Gas $115,418 44,392
MMBtu
LPG $7,043 445
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $230,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $213,180 $138,361 - - - $213,180
02 2.4112: Install soft-start to eliminate nuisance trips $7,472 $8,890 - $7,472
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,230 $117 $4,230
49,186
kWh
- - -
04 3.4155: Meter waste water $3,632 $15 - - $3,632
-
Tgal
-
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $1,816 $60 $1,816
181,626
kWh
- - -
TOTAL RECOMMENDED $230,330 $147,443 $6,046
230,812
kWh
$7,472
-
kW-mo/yr
$3,632
-
Tgal
$213,180
TOTAL IMPLEMENTED $4,230 $117 $4,230
49,186
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs