ITAC Assessment: OR0206
ITAC logo
ITAC Assessment: OR0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Phenolic Resins
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area
n/a
Annual Production 120
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,129 4,067,995
kWh
Natural Gas $99,568 35,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,640 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1232: Keep boiler tubes clean $4,250 $1,000 - $4,250
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $2,050 $2,746 - $2,050
-
MMBtu
-
03 2.7134: Use photocell controls $5,147 $1,105 $5,147
109,613
kWh
- -
04 2.3137: Use power during off-peak periods $42,700 $3,000 $42,700
-
kWh
- -
05 2.6232: Install set-back timers $1,675 $600 $1,675
67,116
kWh
- -
06 2.4133: Use most efficient type of electric motors $373 $825 $373
8,792
kWh
- -
07 2.3212: Optimize plant power factor $4,297 $4,400 $4,297
-
kWh
- -
08 2.8114: Change rate schedules or other changes in utility service $16,148 $43,000 - - $16,148
TOTAL RECOMMENDED $76,640 $56,676 $54,192
185,521
kWh
$6,300
-
MMBtu
$16,148
TOTAL IMPLEMENTED $25,918 $45,930 $5,520
118,405
kWh
$4,250
-
MMBtu
$16,148
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs