ITAC Assessment: MA0164
ITAC logo
ITAC Assessment: MA0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PLASTIC DELI CONTAINERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area
n/a
Annual Production 14,000,000
lb
Production Hrs. Annual 7,344
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $630,632 9,085,874
kWh
Natural Gas $24,980 4,731
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $187 $1,250
17,878
kWh
02 2.2511: Insulate bare equipment $4,170 $3,456 $4,170
60,082
kWh
03 2.2443: Re-use or recycle hot or cold process exhaust air $529 $500 $529
7,620
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,624 $17,000 $8,624
124,267
kWh
05 2.4133: Use most efficient type of electric motors $1,159 $4,126 $1,159
16,706
kWh
TOTAL RECOMMENDED $15,732 $25,269 $15,732
226,553
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs