ITAC Assessment: MI0278
ITAC logo
ITAC Assessment: MI0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Machinery Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 250,000
ft2
Annual Production 305
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,200 4,866,000
kWh
Electricity Demand $142,678 13,932
kW-mo/yr
Natural Gas $7,870 2,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,053

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2628: Utilize a less expensive cooling method $103,740 $220,000 $40,853
608,837
kWh
$34,287
-
kW-mo/yr
- $28,600
02 2.7447: Install vinyl strip / high speed / air curtain doors $94,012 $102,610 $35,083
532,635
kWh
$58,929
-
kW-mo/yr
- -
03 2.7425: Clean or color roof to reduce solar load $45,923 $79,106 $24,960
372,540
kWh
$20,963
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,431 $9,248 $6,758
100,870
kWh
$5,673
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,235 $1,660 $6,114
91,122
kWh
$5,121
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $4,706 $2,901 $4,706
70,237
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $2,804 $480 $1,524
22,705
kWh
$1,280
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $2,391 $8,360 $1,300
19,396
kWh
$1,091
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $2,181 $40 $1,208
18,030
kWh
$973
-
kW-mo/yr
- -
10 2.2515: Use optimum thickness insulation $711 $610 - - $711
-
MMBtu
-
11 2.7142: Utilize higher efficiency lamps and/or ballasts $671 $1,880 $365
5,451
kWh
$306
-
kW-mo/yr
- -
TOTAL RECOMMENDED $280,805 $426,895 $122,871
1,841,823
kWh
$128,623
-
kW-mo/yr
$711
-
MMBtu
$28,600
TOTAL IMPLEMENTED $83,053 $104,285 $46,935
700,351
kWh
$35,407
-
kW-mo/yr
$711
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs