| Assessment Year | 2014 |
|---|---|
| Principal Product | Sheet Metal Components |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
73,000
ft2
|
| Annual Production | 800,001
pieces
|
| Production Hrs. Annual | 3,063
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $130,435 | 1,311,274 |
kWh
|
$0.099 |
| Electricity Demand | $50,308 | 4,619 |
kW-mo/yr
|
$10.89 |
| Electricity Fees | $38,770 | - |
|
- |
| Natural Gas | $21,112 | 8,221 |
MMBtu
|
$2.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,435 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,043 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $7,838 | $7,262 |
$5,486
55,134
kWh
|
$2,352
-
kW-mo/yr
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,362 | $2,700 |
$7,362
73,992
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,081 | $14,125 |
$6,156
61,874
kWh
|
$925
-
kW-mo/yr
|
|
| 04 | 2.4226: Use / purchase optimum sized compressor | $2,681 | $6,350 |
$3,922
39,419
kWh
|
$(-1,241.0)
-
kW-mo/yr
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,278 | $3,660 |
$1,154
11,602
kWh
|
$124
-
kW-mo/yr
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,195 | $3,145 |
$984
9,890
kWh
|
$211
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $27,435 | $37,242 |
$25,064
251,911
kWh
|
$2,371
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $10,043 | $9,050 |
$11,284
113,411
kWh
|
$(-1,241.0)
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs