ITAC Assessment: SD0488
ITAC logo
ITAC Assessment: SD0488
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Sheet Metal Components
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 73,000
ft2
Annual Production 800,001
pieces
Production Hrs. Annual 3,063
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,435 1,311,274
kWh
Electricity Demand $50,308 4,619
kW-mo/yr
Electricity Fees $38,770 -
Natural Gas $21,112 8,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,043

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $7,838 $7,262 $5,486
55,134
kWh
$2,352
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,362 $2,700 $7,362
73,992
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,081 $14,125 $6,156
61,874
kWh
$925
-
kW-mo/yr
04 2.4226: Use / purchase optimum sized compressor $2,681 $6,350 $3,922
39,419
kWh
$(-1,241.0)
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,278 $3,660 $1,154
11,602
kWh
$124
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,195 $3,145 $984
9,890
kWh
$211
-
kW-mo/yr
TOTAL RECOMMENDED $27,435 $37,242 $25,064
251,911
kWh
$2,371
-
kW-mo/yr
TOTAL IMPLEMENTED $10,043 $9,050 $11,284
113,411
kWh
$(-1,241.0)
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs