ITAC Assessment: UD0135
ITAC logo
ITAC Assessment: UD0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PAPER BOARD
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 40,500
ton
Production Hrs. Annual 6,374
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $834,593 15,645,076
kWh
Natural Gas $108,176 18,651
MMBtu
Fuel Oil #6 $1,432,898 302,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $269,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.2136: Install / repair insulation on steam lines $12,421 $3,300 - $12,421
-
MMBtu
02 2.2425: Use flue gases to heat process or service water $152,310 $140,000 $(-15,122.0)
(-360,492)
kWh
$167,432
-
MMBtu
03 2.4131: Size electric motors for peak operating efficiency $8,600 $20,000 $8,600
279,015
kWh
-
04 2.6232: Install set-back timers $4,080 $770 $4,539
101,407
kWh
$(-459.0)
-
MMBtu
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $54,580 - $3,917
146,249
kWh
$50,663
-
MMBtu
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $37,591 - $37,591
-
kWh
-
TOTAL RECOMMENDED $269,582 $164,070 $39,525
166,179
kWh
$230,057
-
MMBtu
TOTAL IMPLEMENTED $71,081 $4,070 $8,456
247,656
kWh
$62,625
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs