ITAC Assessment: SU0246
ITAC logo
ITAC Assessment: SU0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 60,000
ft2
Annual Production 12,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,703 3,449,840
kWh
Electricity Demand $63,214 12,216
kW-mo/yr
Electricity Fees $61,177 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $418,583 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,554 - $2,851
71,292
kWh
$1,703
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,404 - $1,743
43,593
kWh
$1,661
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $2,489 - $1,557
38,922
kWh
$932
-
kW-mo/yr
-
04 3.1182: Make a new by-product $402,220 $41,000 - - $402,220
05 2.4221: Install compressor air intakes in coolest locations $1,989 $42 $1,006
25,155
kWh
$983
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,230 $850 $1,397
34,918
kWh
$833
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,697 $10,420 $1,060
26,494
kWh
$637
-
kW-mo/yr
-
TOTAL RECOMMENDED $418,583 $52,312 $9,614
240,374
kWh
$6,749
-
kW-mo/yr
$402,220
TOTAL IMPLEMENTED $16,363 $11,312 $9,614
240,374
kWh
$6,749
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs