Assessment Year | 2010 |
---|---|
Principal Product | Military Aircraft |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
341,476
ft2
|
Annual Production | 10
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $421,821 | 6,281,600 |
kWh
|
$0.067 |
Electricity Demand | $130,608 | 21,860 |
kW-mo/yr
|
$5.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $109,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,808 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $60,031 | $5,388 |
$60,031
887,237
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,247 | $18,650 |
$31,221
355,631
kWh
|
$7,026
-
kW-mo/yr
|
|
03 | 2.4133: Use most efficient type of electric motors | $2,927 | $9,651 |
$2,590
38,029
kWh
|
$337
-
kW-mo/yr
|
|
04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $634 | $20 |
$634
9,320
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $7,752 | $772 |
$7,752
114,005
kWh
|
- | |
TOTAL RECOMMENDED | $109,591 | $34,481 |
$102,228
1,404,222
kWh
|
$7,363
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $41,808 | $28,321 |
$34,445
402,980
kWh
|
$7,363
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs