1,336
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0195 #01 Y:2024 | 01 | 2024 | Reduce the pressure of compressed air to the minimum required | $23,407 | $750 | |
| LE0569 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $912 | $1,400 | |
| LE0569 #05 Y:2024 | 05 | 2024 | Re-use or recycle hot or cold process exhaust air | $1,415 | $1,500 | |
| LE0569 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $20,033 | $21,165 | |
| LE0569 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $92 | $70 | |
| LE0569 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $1,781 | $400 | |
| LE0569 #01 Y:2024 | 01 | 2024 | Turn off equipment during breaks, reduce operating time | $4,637 | - | |
| IP0191 #08 Y:2024 | 08 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $428 | $1,099 | |
| IP0191 #07 Y:2024 | 07 | 2024 | Recover waste heat from equipment | $5,739 | $13,340 | |
| IP0191 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $87,660 | $91,077 | |
| IP0191 #05 Y:2024 | 05 | 2024 | Use immersion heating in tanks, melting pots, etc | $1,226 | $984 | |
| IP0191 #04 Y:2024 | 04 | 2024 | Recover waste heat from equipment | $27,225 | $8,610 | |
| IP0191 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,730 | $735 | |
| IP0191 #02 Y:2024 | 02 | 2024 | Use optimum temperature | $4,978 | $384 | |
| IP0191 #01 Y:2024 | 01 | 2024 | Eliminate or reduce compressed air usage | $18,779 | - | |
| LE0560 #07 Y:2024 | 07 | 2024 | Improve air circulation with destratification fans / other methods | $9,755 | $45,000 | |
| LE0560 #06 Y:2024 | 06 | 2024 | Install vinyl strip / high speed / air curtain doors | $6,350 | $11,000 | |
| LE0560 #05 Y:2024 | 05 | 2024 | Replace existing hvac unit with high efficiency model | $16,740 | $51,000 | |
| LE0560 #04 Y:2024 | 04 | 2024 | Re-use or recycle hot or cold process exhaust air | $2,378 | $2,500 | |
| LE0560 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $9,378 | $9,800 |