Assessment Year | 2024 |
---|---|
Principal Product | Motor vehicle parts and accessories |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 700 |
Plant Area |
400,000
ft2
|
Annual Production | 444,086
units
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,155 | 3,552,818 |
kWh
|
$0.088 |
Electricity Demand | $51,359 | 14,749 |
kW-mo/yr
|
$3.48 |
Electricity Fees | $42,196 | - |
|
- |
Natural Gas | $143,495 | 15,286 |
MMBtu
|
$9.39 |
TOTAL YEARLY COSTS | $548,205 | |||
RECOMMENDED SAVINGS* | $53,666 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $6,343 | - |
$6,343
72,072
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,722 | $100 |
$2,583
29,353
kWh
|
$139
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $9,378 | $9,800 |
$9,378
106,564
kWh
|
- | - | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $2,378 | $2,500 | - | - |
$2,378
-
MMBtu
|
|
05 | 2.7232: Replace existing hvac unit with high efficiency model | $16,740 | $51,000 |
$16,298
185,203
kWh
|
$442
-
kW-mo/yr
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,350 | $11,000 |
$(-82.0)
(-931)
kWh
|
$(-100.0)
-
kW-mo/yr
|
$6,532
-
MMBtu
|
|
07 | 2.7243: Improve air circulation with destratification fans / other methods | $9,755 | $45,000 |
$(-3,378.3)
(-38,390)
kWh
|
$(-313.2)
-
kW-mo/yr
|
$13,446
-
MMBtu
|
|
TOTAL RECOMMENDED | $53,666 | $119,400 |
$31,142
353,871
kWh
|
$168
-
kW-mo/yr
|
$22,356
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs