Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,341

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0402 #07 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $11,958 $11,073
SD0402 #06 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $12,022 $11,175
SD0402 #05 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $15,282 $11,175
SD0402 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $18,796 $46,094
SD0402 #03 Y:2007 Use most efficient type of electric motors $38,170 $88,300
SD0402 #02 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $74,987 $130,635
SD0402 #01 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $125,747 $39,474
IC0136 #07 Y:2007 Recharge batteries on during off-peak demand periods $9,042 $26,000
IC0136 #06 Y:2007 Reduce ventilation air $23,044 -
IC0136 #05 Y:2007 Use waste heat from hot flue gases to preheat $3,287 $17,000
IC0136 #04 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $1,389 $3,105
IC0136 #03 Y:2007 Use most efficient type of electric motors $2,294 $5,851
IC0136 #02 Y:2007 Install occupancy sensors $2,224 $5,038
IC0136 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,802 $9,080
MZ0001 #05 Y:2006 Install / repair insulation on steam lines $3,915 $3,300
MZ0001 #04 Y:2006 Hardware $24,000 $78,000
MZ0001 #03 Y:2006 Insulate glazing, walls, ceilings, and roofs $3,400 $800
MZ0001 #02 Y:2006 Hardware $75,000 $78,000
MZ0001 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $25,357 $20,580
MS0312 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $551 $4,911