Assessment Year | 2008 |
---|---|
Principal Product | Automotive Airbag Inflators |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
845,000
ft2
|
Annual Production | 13,400,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,548,677 | 34,454,153 |
kWh
|
$0.045 |
Electricity Demand | $476,010 | 58,034 |
kW-mo/yr
|
$8.20 |
Electricity Fees | $208,598 | - |
|
- |
Natural Gas | $139,597 | 11,978 |
MMBtu
|
$11.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $304,325 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,385 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $125,747 | $39,474 |
$125,747
2,800,603
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $74,987 | $130,635 |
$74,987
1,670,097
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $38,170 | $88,300 |
$32,478
723,340
kWh
|
$5,692
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,796 | $46,094 |
$16,664
371,132
kWh
|
$2,132
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,282 | $11,175 |
$15,282
340,355
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,022 | $11,175 |
$12,022
267,753
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,958 | $11,073 |
$11,958
266,322
kWh
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,363 | $900 |
$5,862
130,571
kWh
|
$1,501
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $304,325 | $338,826 |
$295,000
6,570,173
kWh
|
$9,325
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $19,385 | $12,075 |
$17,884
398,324
kWh
|
$1,501
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs