ITAC Assessment: NC0286
ITAC logo
ITAC Assessment: NC0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Shopping carts
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 337,000
ft2
Annual Production 350,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,027 5,209,920
kWh
Electricity Demand $73,641 15,677
kW-mo/yr
Natural Gas $322,748 39,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $159,553 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.451: Add additional production shift $130,000 $20,000 - - - $(-180,000.0) $(-1,000,000.0) - $1,310,000
02 2.7314: Reduce ventilation air $12,177 $35,730 - - $14,075
-
MMBtu
- - $(-1,898.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,904 $100 $5,865
136,400
kWh
$1,539
-
kW-mo/yr
- $(-1,200.0) - $(-300.0) -
04 2.4224: Upgrade controls on compressors $1,892 $2,000 $1,284
29,853
kWh
$608
-
kW-mo/yr
- - - - -
05 2.4224: Upgrade controls on compressors $1,512 $4,600 $887
20,625
kWh
- - $625 - - -
06 2.2414: Use waste heat from hot flue gases to preheat $5,566 $6,500 - - $5,566
-
MMBtu
- - - -
07 2.4151: Develop a repair/replace policy $175 $169 $138
3,215
kWh
$37
-
kW-mo/yr
- - - - -
08 2.7111: Reduce illumination to minimum necessary levels $2,019 $100 $2,019
46,956
kWh
- - - - - -
09 2.7135: Install occupancy sensors $247 $191 $247
5,751
kWh
- - - - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $61 $70 $43
995
kWh
$18
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $159,553 $69,460 $10,483
243,795
kWh
$2,202
-
kW-mo/yr
$19,641
-
MMBtu
$(-180,575.0) $(-1,000,000.0) $(-2,198.0) $1,310,000
TOTAL IMPLEMENTED $20,395 $38,190 $7,534
175,219
kWh
$2,184
-
kW-mo/yr
$14,075
-
MMBtu
$(-1,200.0) - $(-2,198.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs