ITAC Assessment: OK0645
ITAC logo
ITAC Assessment: OK0645
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Foundry Tooling
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $1
M
to 5
M
# of Employees 31
Plant Area 60,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 2,260
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,039 529,080
kWh
Electricity Demand $7,076 4,710
kW-mo/yr
Electricity Fees $735 -
Natural Gas $41,753 6,834
MMBtu
Wood $4,725 1,013
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,343

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,346 $2,900 $1,093
31,736
kWh
$253
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,887 $220 $1,773
26,865
kWh
$214
-
kW-mo/yr
- - $(-100.0)
03 4.426: Modify workload $10,443 $5,600 - - $(-10,482.0)
-
MMBtu
$4,725
-
MMBtu
$16,200
04 4.423: Move product using mechanical means $22,600 $10,000 - - - - $22,600
05 2.7135: Install occupancy sensors $176 $163 $176
2,667
kWh
- - - -
06 4.431: Train operators for maximum operating efficiency $61,280 $44,000 - - - - $61,280
TOTAL RECOMMENDED $97,732 $62,883 $3,042
61,268
kWh
$467
-
kW-mo/yr
$(-10,482.0)
-
MMBtu
$4,725
-
MMBtu
$99,980
TOTAL IMPLEMENTED $63,343 $44,383 $1,949
29,532
kWh
$214
-
kW-mo/yr
- - $61,180
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs