Assessment Year | 2007 |
---|---|
Principal Product | Fuel and Oil Filters |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 438 |
Plant Area |
211,360
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 6,744
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $522,717 | 11,725,746 |
kWh
|
$0.045 |
Electricity Demand | $285,306 | 30,980 |
kW-mo/yr
|
$9.21 |
Natural Gas | $290,981 | 33,989 |
MMBtu
|
$8.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,082 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,415 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,802 | $9,080 |
$1,573
34,169
kWh
|
$682
-
kW-mo/yr
|
- | - | $547 | |
02 | 2.7135: Install occupancy sensors | $2,224 | $5,038 |
$2,043
44,409
kWh
|
$181
-
kW-mo/yr
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $2,294 | $5,851 |
$1,658
36,041
kWh
|
$636
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,389 | $3,105 |
$1,389
30,187
kWh
|
- | - | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $3,287 | $17,000 | - | - | - |
$3,287
-
MMBtu
|
- | |
06 | 2.7314: Reduce ventilation air | $23,044 | - | - | - | - |
$23,044
-
MMBtu
|
- | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $9,042 | $26,000 | - | - | $9,042 | - | - | |
TOTAL RECOMMENDED | $44,082 | $66,074 |
$6,663
144,806
kWh
|
$1,499
-
kW-mo/yr
|
$9,042 |
$26,331
-
MMBtu
|
$547 | ||
TOTAL IMPLEMENTED | $6,415 | $17,223 |
$5,005
108,765
kWh
|
$863
-
kW-mo/yr
|
- | - | $547 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs