ITAC Assessment: IC0136
ITAC logo
ITAC Assessment: IC0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fuel and Oil Filters
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 438
Plant Area 211,360
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,744
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $522,717 11,725,746
kWh
Electricity Demand $285,306 30,980
kW-mo/yr
Natural Gas $290,981 33,989
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,802 $9,080 $1,573
34,169
kWh
$682
-
kW-mo/yr
- - $547
02 2.7135: Install occupancy sensors $2,224 $5,038 $2,043
44,409
kWh
$181
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $2,294 $5,851 $1,658
36,041
kWh
$636
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,389 $3,105 $1,389
30,187
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $3,287 $17,000 - - - $3,287
-
MMBtu
-
06 2.7314: Reduce ventilation air $23,044 - - - - $23,044
-
MMBtu
-
07 2.3132: Recharge batteries on during off-peak demand periods $9,042 $26,000 - - $9,042 - -
TOTAL RECOMMENDED $44,082 $66,074 $6,663
144,806
kWh
$1,499
-
kW-mo/yr
$9,042 $26,331
-
MMBtu
$547
TOTAL IMPLEMENTED $6,415 $17,223 $5,005
108,765
kWh
$863
-
kW-mo/yr
- - $547
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs