ITAC Assessment: LE0222
ITAC logo
ITAC Assessment: LE0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Vinyl Windows and Doors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 102,950
ft2
Annual Production 160,000
pieces
Production Hrs. Annual 2,550
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,708 1,396,080
kWh
Electricity Demand $61,082 5,908
kW-mo/yr
Natural Gas $15,176 1,638
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Increase in Production Savings
01 4.451: Add additional production shift $96,000 $5,000 - - - - $96,000
02 2.7232: Replace existing hvac unit with high efficiency model $13,410 $49,000 $6,296
121,088
kWh
$7,114
-
kW-mo/yr
- - -
03 4.122: Develop standard procedures to improve internal yields $5,760 $5,100 - - - $5,760 -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,048 $2,000 - $3,048
-
kW-mo/yr
- - -
05 2.6218: Turn off equipment when not in use $2,793 $815 $2,793
53,712
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,752 $200 $1,050
20,199
kWh
$702
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $1,714 $7,800 - - $1,714
-
MMBtu
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $513 $480 $513
9,861
kWh
- - - -
09 2.7111: Reduce illumination to minimum necessary levels $2,823 $500 $1,458
28,050
kWh
$1,365
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $127,813 $70,895 $12,110
232,910
kWh
$12,229
-
kW-mo/yr
$1,714
-
MMBtu
$5,760 $96,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs