Assessment Year | 2000 |
---|---|
Principal Product | Metal Stampings and Multi-Slides |
NAICS |
n/a
|
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
52,335
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 2,875
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $31,224 | 777,843 |
kWh
|
$0.040 |
Electricity Demand | $34,701 | 3,817 |
kW-mo/yr
|
$9.09 |
Electricity Fees | $3,765 | - |
|
- |
Natural Gas | $15,428 | 3,690 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,475 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $3,857 | $600 | n/a | - | - |
$3,857
-
MMBtu
|
- | - |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,771 | $10,971 | n/a |
$2,185
52,462
kWh
|
$1,586
-
kW-mo/yr
|
- | - | - |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,131 | - | n/a | - |
$3,131
-
kW-mo/yr
|
- | - | - |
04 | 2.3132: Recharge batteries on during off-peak demand periods | $1,172 | $100 | n/a | - |
$1,172
-
kW-mo/yr
|
- | - | - |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,954 | $1,000 | n/a | - | - | - |
$2,204
-
lb
|
$(-250.0) |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,719 | $4,000 | n/a |
$1,006
24,033
kWh
|
$713
-
kW-mo/yr
|
- | - | - |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $1,375 | $5,600 | n/a |
$805
19,343
kWh
|
$570
-
kW-mo/yr
|
- | - | - |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $1,691 | $2,600 | n/a |
$(-78.0)
(-1,758)
kWh
|
- |
$1,769
-
MMBtu
|
- | - |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,425 | $1,124 | n/a | - | - |
$1,425
-
MMBtu
|
- | - |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $912 | $1,364 | n/a | - | - |
$912
-
MMBtu
|
- | - |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,109 | $420 | n/a |
$648
15,533
kWh
|
$461
-
kW-mo/yr
|
- | - | - |
12 | 2.4221: Install compressor air intakes in coolest locations | $685 | $740 | n/a |
$400
9,672
kWh
|
$285
-
kW-mo/yr
|
- | - | - |
13 | 2.1123: Install automatic stack damper | $904 | $900 | n/a | - | - |
$904
-
MMBtu
|
- | - |
14 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $770 | - | n/a |
$323
7,620
kWh
|
$447
-
kW-mo/yr
|
- | - | - |
TOTAL RECOMMENDED | $24,475 | $29,419 |
$5,289
126,905
kWh
|
$8,365
-
kW-mo/yr
|
$8,867
-
MMBtu
|
$2,204
-
lb
|
$(-250.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs