ITAC Assessment: MS0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Automotive Hose
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 170,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,390 3,972,000
kWh
Electricity Demand $108,527 9,000
kW-mo/yr
Electricity Fees $10,315 -
Natural Gas $152,467 8,505
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,487 $38,702 $14,657
325,196
kWh
$6,513
-
kW-mo/yr
$317
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,170 $1,559 $18,887
419,054
kWh
- $283
03 2.4221: Install compressor air intakes in coolest locations $1,372 $135 $715
15,920
kWh
$637
-
kW-mo/yr
$20
04 2.7142: Utilize higher efficiency lamps and/or ballasts $551 $4,911 $330
7,236
kWh
$213
-
kW-mo/yr
$8
TOTAL RECOMMENDED $42,580 $45,307 $34,589
767,406
kWh
$7,363
-
kW-mo/yr
$628
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs