ITAC Assessment: MZ0001
ITAC logo
ITAC Assessment: MZ0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Radiators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 150,000
ft2
Annual Production 11,000
units
Production Hrs. Annual 3,952
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $422,021 8,907,800
kW-mo/yr
Natural Gas $559,693 53,656
MMBtu
Fuel Oil #1 $5,000 517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,357 $20,580 $25,357
147
kWh
-
02 2.112: Hardware $75,000 $78,000 - $75,000
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $3,400 $800 - $3,400
-
MMBtu
04 2.112: Hardware $24,000 $78,000 - $24,000
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $3,915 $3,300 - $3,915
-
MMBtu
TOTAL RECOMMENDED $131,672 $180,680 $25,357
147
kWh
$106,315
-
MMBtu
TOTAL IMPLEMENTED $82,315 $82,100 - $82,315
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs