*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Brass rods, wires and odd shaped products
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 22,500
ft2
Annual Production 52,800,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,018,575 21,325,030
kWh
Natural Gas $273,800 100,952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,103 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,263

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,900 $22,275 - $5,900
-
MMBtu
-
02 2.2511: Insulate bare equipment $3,351 $1,171 - $3,351
-
MMBtu
-
03 2.2511: Insulate bare equipment $1,846 $1,187 - $1,846
-
MMBtu
-
04 2.2514: Cover open tanks $1,743 $3,312 - $1,743
-
MMBtu
-
05 2.3132: Recharge batteries on during off-peak demand periods $863 - $863
-
kWh
- -
06 3.8211: Convert to aqueous cleaning system $26,400 $18,000 - - $26,400
-
Tgal
TOTAL RECOMMENDED $40,103 $45,945 $863
-
kWh
$12,840
-
MMBtu
$26,400
-
Tgal
TOTAL IMPLEMENTED $27,263 $18,000 $863
-
kWh
- $26,400
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs