1,336
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IA0421 #01 Y:2007 | 01 | 2007 | Repair and eliminate steam leaks | $5,499 | $675 | |
| UM0335 #08 Y:2007 | 08 | 2007 | Use waste heat from hot flue gases to preheat | $1,901 | $1,621 | |
| UM0335 #07 Y:2007 | 07 | 2007 | Keep doors and windows shut when not on use | $1,972 | $50 | |
| UM0335 #06 Y:2007 | 06 | 2007 | Reduce illumination to minimum necessary levels | $5,331 | $15,000 | |
| UM0335 #05 Y:2007 | 05 | 2007 | Lower temperature during the winter season and vice-versa | $7,221 | $500 | |
| UM0335 #04 Y:2007 | 04 | 2007 | Recover waste heat from equipment | $31,917 | $18,591 | |
| UM0335 #03 Y:2007 | 03 | 2007 | Reduce ventilation air | $36,521 | $12,950 | |
| UM0335 #02 Y:2007 | 02 | 2007 | Recover waste heat from equipment | $74,186 | $72,325 | |
| UM0335 #01 Y:2007 | 01 | 2007 | Recover waste heat from equipment | $89,698 | $182,750 | |
| MS0323 #05 Y:2007 | 05 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $257 | $450 | |
| MS0323 #04 Y:2007 | 04 | 2007 | Utilize higher efficiency lamps and/or ballasts | $2,492 | $8,771 | |
| MS0323 #03 Y:2007 | 03 | 2007 | Install compressor air intakes in coolest locations | $2,739 | $3,030 | |
| MS0323 #02 Y:2007 | 02 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,013 | $266 | |
| MS0323 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $12,680 | $26,178 | |
| SD0402 #08 Y:2007 | 08 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,363 | $900 | |
| SD0402 #07 Y:2007 | 07 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $11,958 | $11,073 | |
| SD0402 #06 Y:2007 | 06 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $12,022 | $11,175 | |
| SD0402 #05 Y:2007 | 05 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $15,282 | $11,175 | |
| SD0402 #04 Y:2007 | 04 | 2007 | Utilize higher efficiency lamps and/or ballasts | $18,796 | $46,094 | |
| SD0402 #03 Y:2007 | 03 | 2007 | Use most efficient type of electric motors | $38,170 | $88,300 |