| Assessment Year | 2008 |
|---|---|
| Principal Product | Automotive Mirror Assemblies |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $100 M to 500M |
| # of Employees | 704 |
| Plant Area |
228,000
ft2
|
| Annual Production | 7,000,000
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $974,701 | 22,606,815 |
kWh
|
$0.043 |
| Electricity Demand | $716,322 | 45,273 |
kW-mo/yr
|
$15.82 |
| Electricity Fees | $9,086 | - |
|
- |
| Natural Gas | $409,550 | 41,127 |
MMBtu
|
$9.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $248,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $14,524 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $89,698 | $182,750 |
$(-10,290.0)
(-238,615)
kWh
|
$(-11,325.0)
-
kW-mo/yr
|
$111,313
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $74,186 | $72,325 |
$(-643.0)
(-14,914)
kWh
|
$(-708.0)
-
kW-mo/yr
|
$75,537
-
MMBtu
|
|
| 03 | 2.7314: Reduce ventilation air | $36,521 | $12,950 | - | - |
$36,521
-
MMBtu
|
|
| 04 | 2.2437: Recover waste heat from equipment | $31,917 | $18,591 | - | - |
$31,917
-
MMBtu
|
|
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $7,221 | $500 | - | - |
$7,221
-
MMBtu
|
|
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $5,331 | $15,000 |
$3,544
82,188
kWh
|
$1,787
-
kW-mo/yr
|
- | |
| 07 | 2.7442: Keep doors and windows shut when not on use | $1,972 | $50 | - | - |
$1,972
-
MMBtu
|
|
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $1,901 | $1,621 |
$(-140.0)
(-3,257)
kWh
|
$(-71.0)
-
kW-mo/yr
|
$2,112
-
MMBtu
|
|
| TOTAL RECOMMENDED | $248,747 | $303,787 |
$(-7,529.0)
(-174,598)
kWh
|
$(-10,317.0)
-
kW-mo/yr
|
$266,593
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $14,524 | $15,550 |
$3,544
82,188
kWh
|
$1,787
-
kW-mo/yr
|
$9,193
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs